Preparing studio

Budapest · Renovations

All services

SRV · 04

Wet-room & waterproofing programmes

Bathrooms as engineered envelopes — membrane, falls, tests, and ventilation — specified for the apartment below, not only the tile catalogue.

Liquid waterproof membrane and stacked stone tiles in a shower rebuild
3–5 wksPer wet room in a block
1 flood testLogged before tile grout
L1–L4Substrate to vent layers
0 hiddenValves only with drawn access

Process

How this service runs

  1. 01

    Substrate prep

    Stable backing, routed cracks, slopes marked from drain before membrane.

  2. 02

    Membrane

    System matched to build-up; upturns at penetrations photographed.

  3. 03

    Falls & layout

    Tile plan with expansion at thresholds; niches detailed before cutting.

  4. 04

    Flood test

    Hold time recorded; drying window before grout.

  5. 05

    Vent & handover

    Extract coupled to heating; care sheet for stone and silicone.

Deliverables

What you receive

Every layer is traceable after tile — photos and batch notes sit in your project folder.

Section drawings
Channels, niches, thresholds at hall doors.
Membrane record
Product batch, upturn heights, penetration photos.
Test certificate
Flood start/end, signatory, hold duration.
Tile layout
Movement joints marked before grout.
Care sheet
Cleaners to avoid; re-seal intervals noted.

We bring

  • Membrane spec tied to occupancy below
  • Fixture schedule or studio defaults
  • Flood and vent checklist

You provide

  • Fixture choices or approval window
  • Access for test hold
  • Neighbour notice if stack rules require

Notes

Before you book

  • Apartment below?Extended flood hold and drain access kept clear.
  • Large format tile?Decoupling and movement zones in scope sections.
  • Concealed valves?Only where inspection hatches are drawn and approved.

Planning a shower or full bathroom rebuild?

Plan a wet room