Preparing studio

Budapest · Renovations

Our services

Six disciplines you can contract separately or as one programme.

SRV · 01

Measured survey & as-built capture

Laser measure and field notebook on protected parquet in a Budapest corridor

Before demolition, we record the flat as it stands — heights, out-of-square walls, embedded services, and retained finishes. The output is a dimensioned base plan trades can rely on when pricing.

  • Room-by-room dimensions with ceiling heights and slab steps noted
  • Photo log of existing MEP points, radiators, and meter locations
  • Marked-up PDF plus DWG export when the programme requires CAD
Typical duration
2–4 working days on site + 3–5 days drafting
You provide
Access keys, building rules, any prior plans
Learn more

SRV · 02

Written scope & trade packages

Marked scope document, floor plan, and finish samples on a studio desk

We translate intent into a single scope document: demolition limits, finish codes, exclusions, and interfaces between wet room, kitchen, and hallway. Trades receive packages they can tender without guessing junction details.

  • Room schedule with finish references tied to approved samples
  • Demolition & protection matrix for occupied buildings
  • Variation log template for mid-programme changes
Typical duration
2–3 weeks after survey sign-off
You provide
Priorities, budget band, any designer drawings
Learn more

SRV · 03

Interior renovation delivery

Living room mid-renovation with fresh plaster and floor protection

Full interior execution under our coordination: plaster, floors, joinery interfaces, and phased access when you still live in the property. Site diaries and weekly photo sets keep owners and building managers aligned.

  • Trade sequencing with dust control and elevator bookings
  • Protection spec for parquet, stucco, and shared corridors
  • Quality holds at substrate level before finishes close in
Typical duration
6–14 weeks depending on rooms in scope
You provide
Signed scope, deposit schedule, building contact
Learn more

SRV · 04

Wet-room & waterproofing programmes

Liquid waterproof membrane and tile stacks in a shower rebuild

Bathrooms and shower rooms specified as layered systems — membrane choice, falls, thresholds, and valve access before tiles are ordered. Flood tests and ventilation coupling are part of the package, not an afterthought.

  • Section drawings for niches, channels, and expansion joints
  • Membrane system matched to substrate and occupancy below
  • Recorded flood test and drying windows before grout
Typical duration
3–5 weeks per wet room in a block
You provide
Fixture selections or approval of our schedule
Learn more

SRV · 05

Lighting, heating & electrical intent

Cove lighting channel and labeled wiring during systems installation

We map circuits for real scenes — not grids of downlights — and align radiator moves, board locations, and floor boxes with furniture plans. Licensed partners execute; we hold the intent drawings and inspection checklist.

  • Lighting layout with circuit grouping and dimming notes
  • Heating adjustments tied to opening sizes and curtain positions
  • As-built mark-ups for boards, valves, and driver access
Typical duration
Parallel with interior phases 2–4 weeks active
You provide
Furniture layout or room-use brief
Learn more

SRV · 06

Snagging, handover & aftercare

Snag list binder and keys on a table in a finished room

Completion is documented: walked snag list, care notes for new surfaces, labelled shut-offs, and photography of concealed work before access closes. A defined defect window keeps post-handover requests fair for both sides.

  • Joint walk-through with room-by-room punch list
  • Care sheet for stone, oak, and painted plaster
  • Archive of warranties and supplier contacts in one folder
Typical duration
1–2 weeks close-out after finishes
You provide
Availability for walk-through and sign-off
Learn more

Combine or sequence

Most clients start with SRV·01 and SRV·02, then attach delivery services once scope is signed. Tell us which rooms matter first — we will propose an order that keeps the building quiet and the paperwork ahead of the trades.

Discuss your programme