SRV · 02
Written scope & trade packages
One document set that demolition, finishes, and MEP trades can price — with interfaces at doorways, wet areas, and joinery drawn in section.
Process
How this service runs
- 01
Room & priority brief
We align must-haves, budget band, and phasing with how you use the flat.
- 02
Draft scope v0.1
Internal pass on demolition edges and finish codes — your redlines, not for tender yet.
- 03
Sample workshop
Touch materials in studio; codes on scope match what you approved.
- 04
Trade packages v1.0
Filtered PDFs and BOQ lines per trade — same version number for all quotes.
- 05
Sign-off & lock
Initials on v1.0 before orders; site works only from signed variations.
Deliverables
What you receive
Scope is versioned — site never works from chat screenshots or unsigned PDFs.
- Master scope PDF
- Demolition matrix, finish schedule, exclusions, and programme notes.
- Trade slices
- Electrician, tiler, joiner, etc. each receive a package they can sign.
- Interface drawings
- Thresholds, plinth returns, and shower sections at doorways.
- BOQ lines
- Quantities tied to scope codes for comparable tenders.
- Variation template
- Numbered form with cost/time fields before work proceeds.
We bring
- Specification templates aligned to Budapest trades
- Sample board lineage in scope
- Building-manager summary sheet
You provide
- Survey or existing plans
- Priority list and budget band
- Decision-maker for sample sign-off
Notes
Before you book
- Designer involved?We integrate their layouts but own junction details trades need.
- Partial programme?Phasing sheet shows which rooms sit in which tranche.
- Occupied building?Protection and access rules written as line items, not verbal.